Encoder and resolver technical library

KEBA / LTi LSN-190-5000 Heidenhain SSI G5 / G3 Singleturn / Multiturn Feedback | Technical Guide | Service Visit for Installation, Repair, Alignment

KEBA / LTi LSN-190-5000 | Heidenhain SSI G5 / G3 | ST + MT | Installation, Repair, Alignment workshop illustration

KEBA / LTi LSN-190-5000 · Heidenhain SSI G5 / G3

SpareFaber offers UAE site visits and send-in evaluation for the KEBA / LTi LSN-190-5000. Use this guide to identify the fitted feedback, prepare the right cable and drawing, and investigate faults before ordering parts or starting alignment.

Request a UAE site visit or bench evaluation

Find your part number

Compare the motor nameplate, complete part number and fitted feedback label. G5/G3 optical variants in one guide. Separate actual M23/M40 build, ID/suffix and winding/speed rows. M0 from LSN-190 catalogue.

What to identify Catalogue reference
LSN frame and base LSN-190-5000
G5 option ECN 1313 single-turn SSI plus analogue
G3 option EQN 1325 multiturn SSI plus analogue
Outline row LSN-190 G3 + G5, fitted M23/M40 build

Include any special suffixes and clear photos of the mating connectors and the feedback mount.

What specialist testing can establish

Check the label, G5 or G3 order and SSI profile with the correct lead. Observe the analogue position signals separately from SSI position/turn data on a confirmed compatible setup.

SpareFaber can assess a site visit or a send-in evaluation. Direct encoder checks and complete motor run tests require confirmed hardware and independent setup decisions.

Reference specifications

Parameter Catalogue value Scope
Stall torque reference 50 N·m Verify speed/winding, mounting and temperature limits in the LSN-190 table
G5 and G3 13-bit position and 2,048 analogue periods for both options G3 has 12 bits for retained turns. G5 covers single-turn position.
Catalogue axial length 261 mm without brake, 320 mm with brake G3 + G5 comparison row. Check the exact built envelope and connection.

Mechanical fit

Use the LSN-190 G3/G5 length and outline. Measure actual shaft, seat, mounting pilot and brake stack before selecting a replacement. Confirm fitted M23/M40 arrangement.

Check the fitted part’s complete drawing before choosing a substitute. Compare shaft or bore, mounting dimensions, locating features and harness clearance.

Wiring and connector scope

Trace SSI clock and data pairs, supply/sense where documented and the 2,048-period analogue paths from the exact device and motor connector diagram.

Identify the connector face and drawing revision. Approved service personnel should isolate power, secure the load and verify the relevant wiring before any powered checks.

Internal wiring and machine cables

Verify the fitted M23/M40 motor configuration and match the KEBA feedback cable to the installed control. Check suffix, revision and separate power, brake and thermal paths.

Send clear photos of both mating connectors and the cable label. Note where the harness flexes and whether a connector, cable or drive was recently replaced.

Fault checks

Observed symptom What to check
Existing replacement has a similar ECN or EQN label Confirm it is the SSI version required by G5 or G3.
Serial count is plausible but position deviates Check analogue path, serial selection and fitted coupling.
Reference changes when supply is cycled Confirm whether G3/G5 fits and whether the recorded machine reference is restored.

Alignment and commissioning

Record label, readable serial/turn data, direction and original mechanical reference before removing the encoder. Check the correct KEBA setup and recommissioning reference after fitting.

Compare readable identification, position and turn scope to the exact feedback information, then verify the axis reference on the matching system.

Production and availability

Request availability against the complete LSN-190-5000 order, serial number and feedback label. SpareFaber offers installation, fault diagnosis and alignment assessment. Ask separately for part supply or replacement options.

Motor and drive applications

KEBA/LTi servo drive with explicit G3/G5 SSI support on the installed connector and receiver.

Send the motor order, drive nameplate, feedback label and fault history to check the service scope and assembly revision.

Drawings and manuals

Common questions

What should I send for an evaluation?

Send the complete LSN-190-5000 order, feedback label, connectors at both ends, drive order and the original fault or alarm.

Can I match the feedback from the motor frame?

Use the order information above, then compare the actual feedback label, signals, drawings and reference procedure.

Can you check the motor at our site?

Request a UAE site visit or bench evaluation. Share the location, equipment labels and what happened before the fault so the service team can confirm the appropriate scope.

Request service

Send the full motor and encoder IDs, drive model, connector pictures and fault history with your service enquiry. Include your location for an on-site visit.

Enquire about this encoder or resolver

Tell us what needs checking. We’ll review the details and confirm the scope and quotation before booking chargeable work.

What do you need help with?