Site visit or send-in evaluation
Share the full feedback ID, machine or motor order code, drive or controller model and fault history. Send photos of the label, mating connectors and mounting. Tell us if the fault followed a repair, cable change or controller replacement. Request a UAE site visit or bench evaluation.
What specialist testing can show
Use the approved POWERLINK controller or diagnostic setup with a compatible device description. Verify link, node state, cyclic position and saved settings. Confirm exact Mitchell capability before choosing a feedback tester. Network bench diagnosis and a powered machine run are separate setups.
POSITAL UCD-E2A2B-1413-H150-PAM POWERLINK Encoder technical reference
Find your part number
Use the full label and suffix. The main reference is UCD-E2A2B-1413-H150-PAM. The related rows identify distinct configurations or label codes. Match the actual assembly before substituting.
| Exact ID or order code | Mechanical configuration | Electrical or service distinction |
|---|---|---|
| UCD-E2A2B-1413-H150-PAM · 1434160 | 58 mm blind-hollow design, 15 mm shaft, 30 mm bore depth in exact record. | POWERLINK V2, 13-bit singleturn plus 14-bit multiturn. |
| UCD-E2A2B-1413-HFS0-PAM · 1888054 | POSITAL lists this as the replacement. Both records name a 15 mm blind hollow shaft. Compare current mating drawings. | Same documented protocol and resolution classes. Verify setup and controller device identity. |
Production and end-of-life status
POSITAL labels item 1434160 as Lab Sample and lists UCD-E2A2B-1413-HFS0-PAM item 1888054 as its replacement. This is a documented part transition. Confirm procurement and support for the installed suffix.
Specifications
| Parameter | Value and scope |
|---|---|
| Position | 8,192 positions per turn and 16,384 turns. POSITAL describes a self-powered magnetic turn counter. |
| Network | Ethernet POWERLINK V2, DS-406 profile. Product record specifies cycle time at least 400 µs. |
| Supply | 10–30 V DC, up to 230 mA at 10 V or 100 mA at 24 V per exact record. |
| Mechanical | 15 mm blind bore, 30 mm depth, 58 mm flange size. Actual shaft engagement comes from the mating drawing. |
| Ports | Two female four-contact D-coded Ethernet M12 ports and one male four-contact A-coded supply M12. |
The values in this table apply to the reference build unless a row identifies another scope. Main technical PDF.
Mounting and fit
Match the shaft to the 15 mm blind bore and check insertion so the shaft does not bottom. Use the documented clamping ring and torque support. Inspect witness marks, shaft movement and mounting plate strain after isolation. Compare shaft engagement and anti-rotation hardware before ordering the HFS0 replacement.
Use POSITAL's exact-ID drawings for fit and connector clearance. Record which ports are used and where each cable goes.
Interface and measuring method
The encoder reports absolute position on a POWERLINK network under the controller's cyclic schedule. An Ethernet link light shows the physical path is present. Position exchange also depends on the node configuration, network state, controller mapping and configured process values. Capture the controller's state and error history before changing parameters.
Verified wiring
The UME-xCx-E2 manual sections 4.1 and 4.2 show views of the encoder connectors. Keep the A-coded power port and the D-coded Ethernet ports separate.
| Port | Documented connections |
|---|---|
| A-coded supply, male | 1 +10–30 V DC, 3 supply GND. Contacts 2 and 4 reserved. |
| D-coded Ethernet, female, either port | 1 Tx+, 2 Rx+, 3 Tx−, 4 Rx−. |
The manual distinguishes straight and crossed cable maps. Confirm the controller-side pinout and approved topology.
Cables inside the motor and at the machine
POSITAL lists CBL-M12S-M04D-020EH-046Y-R45F-M080, a 2 m D-coded M12-to-RJ45 cable, under 1434160 accessories. The same page lists field connector CTR-M12S-M04D-NPSC (34050402). Verify pair map and cable duty against the actual equipment. Order a separate power cordset with the documented A-coded mating connector.
Fault checks
External checks. Record the exact label, alarm, drive status and when the fault occurs. Look for visible plug damage, contamination, cable strain and looseness without opening a live assembly.
Isolation before internal work. Follow your site’s lockout procedure. Secure the load against movement, isolate all motor, drive and separate feedback supplies, allow the specified discharge time and verify absence of voltage. A qualified technician should perform internal and electrical checks. Unplug or reconnect only with the applicable circuits safely de-energized.
Harness continuity. Check resistance only on a harness you can disconnect from both the device and the receiver. Compare with shorted meter leads, flex gently at strain reliefs, and test for unintended shorts between conductors and to the shield. Use the schematic to recognize intended bonds. Keep resistance and insulation testers away from connected electronics.
| Observation | What to verify |
|---|---|
| Neither Ethernet port links | Verify the A-coded supply first. Then trace the correct shielded D-coded cable and port. |
| Ethernet links, controller lacks position | Check POWERLINK node address, device description, network state and PDO mapping. |
| Position changes by a fixed offset | Compare saved preset and direction. Inspect the shaft clamp for slip after isolation. |
| Fault follows replacement | Compare identity, firmware, device description and resolution. Verify the HFS0 settings and dimensions with the OEM. |
Powered checks. A qualified technician can fit an approved breakout while de-energized, secure motion, and compare documented supply and return at both ends under the specified load. Use the approved receiver or instrument to observe data or signal pairs. Return to an isolated state before changing connections.
Motor and drive applications
This page applies to POSITAL item 1434160. The HFS0 is the manufacturer-listed replacement, subject to fit and commissioning checks. Refer to the separate TWK FSoE guide when the installed device uses EtherCAT. Network connectors can look similar while protocol and configuration differ.
Angle of alignment and commissioning
Save the original node setup, scaling, direction, preset and physical reference if readable. Re-establish the machine datum after installing the shaft and validate the permitted travel and turn count. Treat any motor-specific electrical offset as an OEM setting.
Drawings, pin maps and manuals
- Main technical PDF. Start with the exact type or variant marked in the guide.
- Manufacturer or exact product reference. Use the order code and select the applicable downloads.
- POSITAL-listed replacement 1888054. Compare the HFS0 exact record and drawing.
- POWERLINK cable maps. The manual separates straight and crossed cable wiring.