Site visit or send-in evaluation
Send the full TR order number, old encoder plate, PLC/master, station address and bus LED pattern. Include the drawing or photo of the connection cap, the old GSD and the configured scale. Use the enquiry form to share the details.
What specialist testing can show
A compatible PROFIBUS DP master and bus analyzer can verify node entry into data exchange, parameterization, status and position. Compare the response on an isolated service segment with a properly terminated setup. Verify mechanical rotation and preset independently. Exact Mitchell TI-5000JX and TI-3000JX support for this fieldbus model was not verified. TR exact pin and termination sheet (PDF) · TR PROFIBUS interface manuals
TR-Electronic CEV582M-10539 PROFIBUS DP Encoder technical reference
Find your part number
Read CEV582M-10539 from the order field. The reference data sheet also names CEV58M-00539. Match the complete suffix, shaft D-cut, flange and terminal configuration. Save the bus settings and preset before disconnecting.
| Order number | Position and interface | Mechanical / application note |
|---|---|---|
| CEV582M-10539 | 4096 steps × 4096 revolutions, PROFIBUS DP, binary | ZB85 flange, Ø10 mm D-cut solid shaft. Main terminal map below. |
| CEV58M-00539 | Earlier unit named in the TR alternative field | Use its own nameplate and legacy hardware record for exact configuration. Confirm migration in the controller. |
| CEV582M-00067 | 8192 steps × 4096 revolutions, separate PROFIBUS build | Other order code with its own drawing and connection details. |
TR CEV582M-10539 exact data (PDF) · TR 00067 comparison record (PDF)
Production and end-of-life status
TR's exact sheet marks CEV582M-10539 as the alternative for CEV58M-00539. It establishes an OEM-documented replacement pair. Confirm current orderability, revision and legacy support directly with TR. TR exact alternative and drawing (PDF)
Specifications
| Parameter | Value and source scope |
|---|---|
| Position | 4096 steps/rev × 4096 revolutions, binary and parameterizable via the interface. |
| Network | PROFIBUS DP. TR-ECE-TI-GB-0065 terminal sheet for the documented cap. |
| Supply | Overview lists 10–30 V DC. The attached X1/X2 wiring sheet labels US 11–27 V DC. Confirm requirements for the actual cap and unit with TR before applying power. |
| Fit | ZB85 locating geometry, Ø10 × 19.5 mm nominal D-cut solid shaft. Use drawing 04-CEV582M-M0236. |
| Environment and entry | IP65, −20 to +75 °C. One M12 and two M16 cable glands, radial. |
Mounting and fit
The solid shaft is driven through a suitable separate coupling and the housing mounts to the machine. Compare the D-flat and centering features with drawing 04-CEV582M-M0236. Check for shaft preload, a missing restraint or a slipped coupling under isolation. Use the machine and coupling manufacturer's instructions for fasteners. Route cables within the illustrated bend limits so the glands are secure and the cap seals correctly. TR exact mechanical drawing (PDF)
Interface and measuring method
The encoder is an absolute multiturn slave. The PROFIBUS DP master uses the correct GSD and encoder module to configure it and read position cyclically. The physical turn count and the configured measuring units are separate. A node can exchange data while the PLC has the wrong scaling, direction or preset. Compare the raw value over a known rotation to the PLC display.
Before replacing the 00539, record the current address, master project, configured module, scaling and preset. Match the replacement's GSD and behavior to the PLC project before releasing the machine. TR device-specific notes (PDF) · TR GSD and device documentation downloads
Verified wiring
Use the following only for the X1/X2 four-position screw clamps shown in the manufacturer sheet included for 10539. Confirm terminal markings at the cap and preserve the IN/OUT arrangement.
| Position | X1 bus in | X2 bus out |
|---|---|---|
| 1 | Data A IN | Data A OUT |
| 2 | Data B IN | Data B OUT |
| 3 | US supply, terminal sheet 11–27 V DC | US supply, terminal sheet 11–27 V DC |
| 4 | GND / 0 V | GND / 0 V |
The termination switch S3 is ON at the end of the segment for the documented arrangement. It disconnects the downstream A/B paths when switched on. Follow TR's reference-potential and power-feed notes for the last station. Set the station number on S1/S2 only as the approved bus plan specifies. TR terminal assignment, switches and grounding (PDF)
Cables inside the motor and at the machine
This model has glands and screw clamps at the machine. It has no in-motor PCB-to-M23 loom. Use the approved PROFIBUS cable and shield termination, match the gland clamping range and keep the documented bend radius. The exact sheet shows cable entry sizes and X1/X2 functions. Use the PLC/vendor documentation for the far-end connector and address any separately powered segment ends. Cable gland and terminal drawing (PDF)
Fault checks
Coordinate a controlled stop before opening the cap. Follow your site’s lockout procedure. Secure the load against movement, isolate all motor, drive and separate feedback supplies, allow the specified discharge time and verify absence of voltage. A qualified technician should perform internal and electrical checks. Unplug or reconnect only with the applicable circuits safely de-energized. Disconnecting an intermediate node can interrupt other stations.
- Read the master first. Record the failed station, LED pattern, address and whether all downstream nodes are affected. Check status against the exact LED legend.
- Inspect and check the detached branch. With the harness isolated from the encoder and receiver at both ends, use resistance mode. First short the meter probes to establish lead resistance. Check each conductor end to end and flex the cable gently at the strain relief. Check between unrelated wires and from signal wires to shield or shell. Expect open only where the drawing calls for isolation. Compare any intentional sense links or shield bonds with the equipment drawing. Keep insulation testers away from connected electronics. Check A/B order, shield continuity, clamp seating, contamination and terminating components. Take into account any intentional termination when testing a cable with connectors attached.
- Check power and configuration. With an approved breakout and controlled energized procedure, measure US to GND under load, using the confirmed supply limits. Verify S3, station address, GSD and PLC module parameters. A multimeter can check supply and wiring but a bus analyzer is needed for data faults.
- Interpret. If stations beyond this cap drop out after a swap, check S3 and pass-through. If the device is in data exchange but the reading is wrong, compare raw position, scaling and preset and check coupling. Persistent device memory or position errors on a verified service segment warrant specialist testing.
Motor and drive applications
Use this unit on a compatible PROFIBUS DP segment for absolute shaft or machine-axis position. It is not an SSI or PROFINET substitution. Verify the network class, firmware and machine scaling in the engineering project. TR exact fieldbus identification (PDF) · TR PROFIBUS reference manual list
Angle of alignment and commissioning
Commission mechanical coupling, count direction, station number and machine datum. Back up the original PLC and encoder configuration. Apply an approved preset at a known standstill position and confirm actual movement and wrap after replacement. Any separate motor commutation procedure belongs to the servo's motor feedback. TR PROFIBUS commissioning and preset resources
Drawings, pin maps and manuals
- TR CEV582M-10539 exact package (PDF). Order number, OEM alternative, mounting drawing, connector sheet and S1/S2/S3 details.
- TR CEV582M-00067 aggregate documentation (PDF). Different resolution build. Use the exact 10539 wiring sheet for the main unit.
- TR downloads. GSD, product information and documentation.
- TR encoder and linear-transducer interface manuals. Select the applicable PROFIBUS profile and revision.