What specialist testing can show
TI-5000JX bench. TI-5000JX Athena supports Sigma-7 24-bit ABS per the release note. Match the fitted motor and read the reported encoder ID before interpreting data.
TI-3000JX motor run. The cited Athena note identifies Yaskawa serial run support as in development. Confirm exact availability and fixture with Mitchell for this setup.
Starting lead. Verify the exact Sigma-7 motor connector and Mitchell lead for the fitted suffix.
Yaskawa UTTAH-B24RU21 Sigma-7 24-Bit Absolute Encoder technical reference
Find your part number
Compare the fitted feedback label, complete motor order and connector. A motor order and an encoder MPN identify different items.
| ID or order | How to identify it |
|---|---|
| UTTAH-B24RU21 | Mitchell’s exact Sigma-7 24-bit absolute encoder under its ID 6 identification entry. |
| UTTAH-B24RK21 and UTTAI-B24 | Mitchell lists these separately under ID 7. Read the motor’s OEM code before deciding which retention procedure applies. |
| UTTSI-B24 | Sigma-7 24-bit incremental branch listed separately under ID F. |
Production and end-of-life status
Confirm orderability and any replacement with the manufacturer against the full fitted ID. The linked documents identify the documented setup.
Specifications
| Parameter | Verified scope |
|---|---|
| Within-turn resolution | 24-bit absolute on the named UTTAH-B24RU21. |
| Retention by motor order | Yaskawa’s Sigma-7 rotary manual identifies code 6 as batteryless absolute and code 7 as absolute on the listed motor ranges. Verify the complete motor order. |
| Test profile | Mitchell documents 24-bit Sigma-7 bench support. Determine the exact connector and setup from the motor and encoder. |
Interface and measuring method
The SERVOPACK reads digital position from the serial encoder. With the correct option, the system can also track turns across an interruption. Identify the installed retention arrangement before interpreting a battery, position or absolute-encoder alarm.
Mounting and fit
Photograph the encoder suffix, motor order, connector exit and fitted rear assembly. Check the precise Yaskawa outline and service instructions for the installed frame. If the assembly has a factory locating feature, keep its reference intact until the replacement method is confirmed.
Wiring and connector scope
Use the Sigma-7 manual for the exact motor encoder plug and the installed SERVOPACK encoder port. Trace supply, return and the serial circuit using that view. Match retention wiring to the fitted encoder and drive before disconnecting.
Internal motor and machine cables
Order the OEM machine cable from the motor and SERVOPACK ordering tables by connector and length. Identify the internal loom separately. A connector family shared with another Sigma-7 option does not establish pin compatibility.
Fault checks
Use the site’s isolation procedure before opening a connector or checking resistance. Secure the load against motion, lock out relevant energy sources, wait the specified discharge time and have a qualified technician verify isolation. Follow the OEM procedure for any retention battery.
What can I check on the machine?
Disconnect the harness at both ends. Check end-to-end continuity against the exact drawing, then check for unintended shorts between conductors and to the shell or shield. Compare against the documented shield bonds. Inspect pins, keying, debris, moisture and latch engagement. Check clamps or fasteners only where accessible under the approved procedure.
Use only the OEM-approved powered check and a suitable breakout. A qualified technician can compare the voltage across the specified supply and return with the model’s limits under the stated test conditions. A multimeter can check supply health. Signal integrity and communications require the appropriate signal test.
| Symptom | What to verify |
|---|---|
| No serial ID | Confirm Sigma-7 mode and the connector, then test supply and the isolated serial cable path. |
| Absolute or battery alarm after service | Match the exact motor retention code and read the original drive alarm before replacing the encoder or resetting the reference. |
| Good bench data and intermittent machine alarms | Check the full machine harness, connector latch and drive receiver. Compare conditions under which the alarm appears. |
Angle of alignment and commissioning
Save the existing drive settings, absolute reference and alarm history. Follow the matched Yaskawa commissioning process if the feedback or memory changes. A reference reset can change the machine coordinate system and needs the machine’s approved procedure.
Motor and drive applications
Yaskawa Sigma-7, identify the specific motor series from its order
Confirm motor order, actual retention arrangement, exact test cable and connector revision.
Related SpareFaber guides
Drawings, pin maps and manuals
- Yaskawa Serial Encoder Identification. Identification table, ID 6
- Mitchell Yaskawa Serial Encoder Testing. Scope of TI-5000JX serial tests. Match the hardware and selection.
- Yaskawa Sigma-7 rotary servomotor product manual. Model designation, motor drawings and encoder connection by motor order.
- Yaskawa Sigma-7 SGM7J product family. Family reference and OEM drawings. Match the actual motor before applying it.
Questions
Can I use a similar label as a replacement?
Compare the interface, mechanical fit, connector, data or commutation requirements and OEM option before choosing a substitute. The ID table gives the useful distinctions for this guide.
What information helps with a diagnosis?
Send the encoder and motor labels, drive model, alarm history and both connector views. Say whether the problem began after cable work, encoder replacement or a drive change. We can confirm visit scope or send-in evaluation and timing from those details.
Site visit or send-in evaluation
Send the encoder and motor labels, drive model, alarm history and both connector views. Say whether the problem began after cable work, encoder replacement or a drive change. We can confirm visit scope or send-in evaluation and timing from those details.